DATA CENTER CONSTRUCTION

Building the Infrastructure of Tomorrow

Ashgroup brings its studio-style construction expertise to mission-critical data center facilities across Southern Ontario and beyond — delivering transparency, precision, and performance at every phase.

Construction Site Scene

SERVICES

End-to-End Data Center Costruction

From initial site selection to final commissioning, Ashgroup manages every phase of your data center project — with the hands-on transparency that defines all our work.

01

SITE SELECTION & PLANNING

Strategic site evaluation covering power grid access, fiber connectivity, seismic risk, zoning, cooling climate, and local workforce availability.

​

04

CIVIL & STRUCTURAL

Earthworks, foundations, structural steel, concrete, roofing, and building envelope — engineered for 40+ year facility lifespans and heavy mechanical loading.

02

DESIGN & ENGINEERING

Comprehensive structural, mechanical, electrical, and plumbing engineering. Redundant power distribution, N+1 cooling, and raised floor systems.

05

POWER & COOLING SYSTEMS

High-voltage utility interconnection, substations, UPS systems, backup generators, and advanced liquid cooling for rack densities up to 50kW+.

03

MODULAR CONSTRUCTION

Prefabricated power and cooling modules assembled and tested off-site — reducing project timelines by 30–50% versus conventional builds.

​

06

COMMISSIONING & HANDOVER

Integrated systems testing, DCIM deployment, staff training, and a complete documentation package — ensuring Day 1 operational readiness.

​

FACILITY TYPES

Every Type of Data Center

Whether you're building a hyperscale AI campus or a compact edge facility, Ashgroup has the engineering depth and project management discipline to deliver.

FEATURED

Hyperscale Data Centers

Designed for cloud providers, AI platforms, and large enterprises. Campus-scale facilities with power envelopes exceeding 100MW — engineered for rapid expansion and long-term efficiency.

POWER CAPACITY

50 MW - 500+ MW

TIMELINE

16 - 24 months

MULTI-TENANT

Colocation Facilities

Multi-tenant facilities designed to maximize leasable white space, power density, and connectivity — built to attract premium enterprise and cloud tenants.

POWER CAPACITY

5 - 50 MW

TIMELINE

12 - 18 months

SINGLE TENANT

Enterprise Data Centers

Owner-operated facilities for mission-critical applications and proprietary infrastructure — with full control over security, redundancy, and compliance.

POWER CAPACITY

1 - 20 MW

TIMELINE

10 - 16 months

DISTRIBUTED

Edge Data Centers

Small-footprint facilities deployed close to end users for real-time applications, autonomous systems, and distributed computing where latency is critical.

POWER CAPACITY

100 kW - 2 MW

TIMELINE

 4- 8 months

CRITICAL SUCESS FACTORS

What Makes a Data Center Project Suceed

Every successful project depends on early, expert decisions across six dimensions. Ashgroup brings cross-disciplinary experience to each one.

01 - POWER

POWER INFRASTRUCTURE

Securing grid connections, sizing substations, and building in redundant UPS and standby generation — with long-lead equipment ordered before ground breaks.​

04 - LOCATION

SITE STRATEGY

Low disaster risk, climate-based cooling efficiency, expansion land, and end-user proximity all feed into systematic site evaluation.

​

​

02 - CONNECTICITY

NETWORK INFRASTRUCTURE

Proximity to dense fiber ecosystems, carrier-neutral access, and bandwidth capacity are essential for competitive colocation and cloud facilities.

​

05 - EVIRONMENT

COOLING & SUSTAINIBILITY

As rack densities climb for AI workloads, liquid cooling and advanced airflow management are essential alongside renewable energy procurement.

​

03 - APPROVALS

ZONING & PERMITTING

Data centers occupy a complex regulatory space with unique noise, power draw, and water use requirements. Early authority engagement is critical.​

​

06 - DELIVERY

PROJECT CONTROLS

Delays can cost millions per month. Ashgroup tracks cost, schedule, and procurement daily with real-time project intelligence and full client visibility.​

​

OUR STUDIO

A New Way to Build
Mission-Critical

Ashgroup was founded out of a passion for complete transparency between clients and contractors — a principle that is especially critical in data center projects where a single delay can have significant commercial consequences.

With over 30 years of industry experience and partners with backgrounds in architecture, engineering, and project management, we bring a uniquely integrated, studio-style approach to every mission-critical project.